Télécharger Imprimer la page

PB Heat 211A Serie Mode D'emploi

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

S
ERIES
TO THE INSTALLER: This manual is the property of the owner and must be affixed near the boiler for future
reference.
TO THE OWNER: This boiler should be inspected annually by a Qualified Service Agency.
WARNING
If the information in this manual is not
followed exactly, a fire or explosion may
result causing property damage, personal
injury or death.
– Do not store or use gasoline or other
flammable vapors and liquids in the vicinity
of this or any other appliance.
– WHAT TO DO IF YOU SMELL GAS
• Do not try to light any appliance.
• Do not touch any electrical switch;
do not use any phone in your building.
• Immediately call your gas supplier from
a neighbor's phone. Follow the gas
supplier's instructions.
• If you cannot reach your gas supplier,
call the fire department.
– Installation and service must be performed
by a qualified installer, service agency or
the gas supplier.
Service Agency
Address
Boiler Model No.
U
I
SER'S
NFORMATION
211A
TO BE COMPLETED BY THE INSTALLER
Serial No.
PB HEAT, LLC
131 S. CHURCH ST • BALLY, PA 19503
M
ANUAL
G
B
TM
AS
AVERTISSEMENT
À défaut de suivre les instructions à la lettre, un
incendie ou une explosion risque de causer des
dommages matériels, des blessures ou des pertes
de vie.
– Ne pas entreposer ni utiliser d'essence ou ni
d'autres vapuers ou liquides inflammables à
proximité de cet appareil ou de tout autre
appareil.
– QUOI FAIRE S'IL Y A ODEUR DE GAZ
• Ne pas tenter d'allumer d'appareils.
• Ne toucher aucun interrupteur
électrique. Ne pas utiliser de téléphones
dans le bâtiment ou il y a des odeurs.
• Contacter immédiatement votre
fournisseur de gaz depuis un bâtiment
voisin. Suivre les instructions du
fournisseur.
• S'il est impossible de joindre le
fournisseur de gaz, contacter le service
des incendies.
– L'installation et l'entretien seront assurés
par un installateur ou un service d'entretien
qualifié, ou par le fournisseur de gaz.
OILERS
Phone No.
Date of Installation:
GG8045 R11 (02/24-2C)
©2024 PB Heat, LLC. All rights reserved.
Printed in U.S.A.

Publicité

loading

Sommaire des Matières pour PB Heat 211A Serie

  • Page 1 TO BE COMPLETED BY THE INSTALLER Service Agency Phone No. Address Boiler Model No. Serial No. Date of Installation: PB HEAT, LLC 131 S. CHURCH ST • BALLY, PA 19503 GG8045 R11 (02/24-2C) Printed in U.S.A. ©2024 PB Heat, LLC. All rights reserved.
  • Page 2 ⚠ WARNING Product Safety Information Refractory Ceramic Fiber Product This appliance contains materials made from refractory ceramic fibers (RCF). Airborne RCF, when inhaled, have been classified by the International Agency for Research on Cancer (IARC), as a possible carcinogen to humans. After the RCF materials have been exposed to temperatures above 1800°F (980°C), they can change into crystalline silica, which has been classified by the IARC as carcinogenic to humans.
  • Page 3 INSTRUCTIONS FOR OPERATION 1. The installation is not complete until Rating and Lighting Plates are on the boiler and the “User’s Information Manual” and “Installation Instructions” are hung near the boiler. 2. System should be maintained in good repair. Radiators, baseboard units and/or convectors must be kept clean. 3.
  • Page 4 Figure 1: Lighting Instructions, Standing Pilot...
  • Page 5 POUR VOTRE SÉCURITÉ, LISEZ AVANT L’ALLUMAGE MISE EN GARDE: Négliger de suivre ces instructions à la lettre pourrait provoquer un incendie ou une explosion causant des dégâts matériels, des blessures ou la mort. à partir du téléphone d’un voisin. Suivre les A.
  • Page 6 Figure 2: Operating Instructions, Spark Ignited Pilot...
  • Page 7 POUR VOTRE SÉCURITÉ, LISEZ AVANT L’ALLUMAGE MISE EN GARDE: Négliger de suivre ces instructions à la lettre pourrait provoquer un incendie ou une explosion causant des dégâts matériels, des blessures ou la mort. de gaz, appeler le service des incendies. A.
  • Page 8 ANNUAL INSPECTION PROCEDURE A. Flue product carrying areas of the boiler and the vent system should be thoroughly inspected each year by an experienced, qualified service agency using the following procedure. 1. The unit must be “shut down” and allowed to cool. 2.