Installation:
1. Consult a qualified electrician to ensure correct branch circuit conductor.
2. Switch power off at the meter box and ensure that there is no power to the light.
3. Plug the plug to the socket.
4. Switch power on at the meter box.
Normal use state.
Instructions for use
1. Use hook.
a
2. Wall fixing holes:
The user needs to fix it on the wall with M6 screws.
90mm
This abuse operation is the worst state.
8