Télécharger Imprimer la page

KERN BFN-A01 Instructions D'installation page 8

Publicité

1.4 Installation
• The necessary preparatory work is described in the relevant in-
1. Anchor each base plate to the floor using suitable fastening materials
2. Place the weighing platform with the levelling feet in the recess of the foot plates
(the distance A between the weighing platform and the drive-on ramp must be at
least 2 mm)
2
BFN-A01_BFN-A05_BFS-A01N_BFS-A02N_BFS-A09N_BFS-A11-IA-def-2451
INFORMATION
stallation instructions for the weighbridge.

Publicité

loading

Ce manuel est également adapté pour:

Bfn-a05Bfs-a01nBfs-a02nBfs-a09nBfs-a11