1.4 Installation
• The necessary preparatory work is described in the relevant in-
1. Anchor each base plate to the floor using suitable fastening materials
2. Place the weighing platform with the levelling feet in the recess of the foot plates
(the distance A between the weighing platform and the drive-on ramp must be at
least 2 mm)
2
BFN-A01_BFN-A05_BFS-A01N_BFS-A02N_BFS-A09N_BFS-A11-IA-def-2451
INFORMATION
stallation instructions for the weighbridge.