Assembly
Step 14: Connect the Rod Cables through the Right Floating and Lat Tower Pulleys
14-1 Put the right cable that runs through the Lat Pulley Housing through the Floating Pulley (A).
14-2 Pull the same cable through the Pulley on the Rear Lat Cross Bar (B) and then through the Pulley on the Front Lat Cross
Bar (C).
14-3 Put the cable end through the Cable End Ball Stop (D).
14-4 Attach the Cable Core (E) to keep the cable from falling out of the pulleys.
14-5 Repeat steps 14-1 through 14-4 on the opposite side.
D
C
B
E
A
19
Assembly Manual