Wall-mounted installation effect
③ Charger installation.
digram.
M4
M4
1.2±0.1N•m
1.2±0.1N•m
Pole-mounted charger installation (optional)/
Installation des Ladegeräts auf einem Pfosten (optional)/
Montage d'un chargeur monté sur pieu (en option)/
Instalación de cargador montado en poste(opcional)/
Installazione del caricabatterie su palo (opzionale)/
Op palen gemonteerde laderinstallatie (optioneel)/
Pålmonterad laddarinstallation (tillval)/
Asennuspylvääseen asennettavan latauslaitteen asennus (valinnainen)
The drill size is Φ12 mm and the drilling depth is about 70 mm.
③ Install the backplate and the
① AC line installation
② Pile installation(after threading).
.
socket-out.
Φ12×70 mm
M4
1.2±0.1N•m