Télécharger Imprimer la page

HeatFab Saf-T Vent EZ Seal Directives D'installation Et D'entretien page 5

Paroi simple connecteur d'évent à gaz, doublage de cheminée & évents aux gaz spéciaux (é-u) / évent de type bh pour appareils de catégorie i/ii (canada), pour l'évacuation des appareils léger résidentiels et commerciaux pour appareils de catégorie i, ii,

Publicité

Les langues disponibles

Les langues disponibles

2. The horizontal termination shall be located not less than 12 inches above grade or anticipated snow line
(remember to consider snow and ice falling from overhead objects), and not less than 7 feet above grade
when located adjacent to a public walkway. It shall also terminate a minimum of 4 feet below, 4 feet
horizontally from, or 1 foot above any door, window, fresh air intake, utility meter or regulator unless the
appliance is Listed differently. The termination must be a minimum of 6 feet from the combustion air intake
of any other appliance. Proper judgment may require greater distances depending on the size of the
equipment installed or site conditions. Consult with the local Authority Having Jurisdiction.
3. The termination should be away from trees,
shrubs, or decorative items as flue gases
could cause damage.
4. The total equivalent horizontal distance of
the vent system from the appliance flue
collar to the outside of the termination shall
not be less than 14 inches.
5. A minimum of one (1) horizontal support is
required for every 6 feet of run.
VERTICAL INSTALLATION REQUIREMENTS
1. The vent system must terminate at least 3
feet above the roof line and at least 2 feet
higher than any portion of the building within
10 feet.
2. When terminated at a height of more than 6 feet above the roof, the vent must be supported by a Saf-T
Vent Guy Section. Refer to the Guy Support section of these installation instructions.
3. The vent system must terminate with one of the Saf-T
Vent Terminations; except when a Termination or
approved mechanical vent device is specified or
provided by the appliance manufacture.
4. The total continuous distance of the vent system from
the appliance flue collar to the termination shall not
exceed that specified in the appliance manufacturer's
installation instructions. When venting natural draft
appliances the termination must be at least 5 feet
above the topmost draft hood. Otherwise a Listed
mechanical draft inducing device is required.
5. Vertical supports are required after every transition to
vertical. Vertical supports are also required above
every offset elbow. See Table 3 for vertical support
requirements.
JOINT SEALING AND CONNECTION METHOD
Model EZ Seal/EZ 316 (Diameters 6" thru 16") is joined using the Ring & Tab Method. EZ Seal/EZ 316 is also
manufactured with a factory installed seal on the inside of the
female (outlet) end making the use of any additional sealant
unnecessary.
To Connect:
Note: It is required to apply gasket lubricant (p/n 7001SIL-5), sold
separately) to the factory installed silicone gasket when
assembling the
pipe. Apply lubricant directly to the gasket on the
inside female pipe end, both edges of gasket.
1. Connect parts using the Ring and Tab Connection
Method. See Fig 5A.
a. To connect, slide the lock ring away from the end
to allow clearance for the tabs extending from the
female end.
b. Engage the two sections making sure the tabs stay to the outside of the vent.
PI-GCINS 4/17
1 Ft. Above Doors & Windows
4 Ft. Horizontally from
Doors and Windows
4 Ft. Below any
window or fresh
air inlet.
1 Ft. above ground
or snow line
Fig 3. (Horizontal Installation Requirements)
10'
2'
(2 Ft. Above Structures within 10 Ft.)
Fig 4. (Vertical Installation Requirements)
Ring
Tab
Fig 5A. (Ring and Tab Joint)
7 Ft. Above Public
Walkways and Drives
Sidewalk
Tabs Under Ring
Fold Tabs
Over Ring

Publicité

loading

Ce manuel est également adapté pour:

Saf-t vent ez 316Saf-t vent gc 316