info@4rain.com
www.4rain.com
5
Installation and assembly
5.4.4 PROFI
Two or more tanks are connected by DN 70 special
seals and HT pipes to the mounts moulded on the
bottom of the tanks. The openings for these con-
nections must be made with a core drill 83 mm in
diameter. Ensure that there is at least 800 mm be-
tween end-to-end tanks and 1000 mm between
side-by-side tanks.
Fig. 29:Interconnecting multiple tanks – PROFI
46 / 108