4. INSTALLATION
1) Fix the analysis chamber to the wall, using the screws and plugs supplied.
I
The analysis chamber must be level (not on an incline), so that the probes installed in it are vertical.
2) Fit the 2 saddles :
3) Assemble the 2 sets [fitting / valve / saddle] :
4) Connect the 2 semi-rigid pipes.
Ø 12
I
Do not damage the thread inside
the collar.
4