Installation
1. Mount the Smart Controller (SC) on the clear wall of the tank/sump.
2. Connect the DC pump wire into the SC and install the water tubing (Notice to set the ATO
output tubing higher than the tank/sump and the reservoir level to prevent siphon).
3. Connect the power adapter into an AC socket and then into the SC to initialize.
4. Position SC by moving the outside controller under the present water level or 1/5 inch (5mm)
higher than the present water level to test the ATO function.
Power
Tank/Sump
Smart
Controller
SATO-100P
Tank/Sump
Front View
Magnet
Wet side
Side View
Mounts to Clear Glass or Acrylic sumps
Max wall thickness: 1/2 inch (12.7mm)
Max distance for sensor: 1 inch (25.4mm)
Smart
Controller
Dry side
English
DC Refill Pump
Reservoir
2