Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

6. Set up

■ INSTALLING HANDLE
SE1
• Loosen the 4bolts on the upper cap
and insert the handle. Retighten the
(1)
bolts securely. (SE1)
(2)
(1) Upper cap
(2) Bolts
■ INSTALLING DEBRIS GUARD
SE2
• Attach the debris guard with the bolts
(2)
provided to the shaft.
(1)
And attach the guard skirt. (SE2)
(1) Debris guard
(2) Bolts
(3) Guard skirt
(3)
■ INSTALLING LINE HEAD (SE3)
1. While locking the gear shaft, by
inserting the supplied tool into the
SE3
upper holder on the gear box, loosen
and remove the hexagon nut(left-
(1)
handed)
(2)
2. Fit the line head assembly to the gear
(3)
shaft over the upper holder and lower
holder tucking alminum ring. Hand-
tighten it securely.
(1) Alminum ring
(2) Lower holder
(3) Upper holder
BCZ400SW
U
S
US-9

Publicité

Table des Matières
loading

Table des Matières