Télécharger Imprimer la page

Pfister SANTIAGO 49 Serie Manuel D'installation page 3

Publicité

Les langues disponibles

Les langues disponibles

7
7E
7B
7A
7D
7C
7 HANDLE FLANGE ATTACHMENT
Place Plastic Ring (7A) and Flange (7B) over Valve Body (7C) covering the Valve Body
Washers (7D). Secure by threading Plastic Nut (7E) onto the Valve Body (7C).
8
8C
8A
8B
8 HANDLE INSTALLATION
Screw Stem Extender (8A) onto the Valve Stem (8B). With Valves in "Closed" position,
attach Handle (8C) onto Valve Stems (8B) and tighten Set Screws (8D) with the Hex
Wrench (8E) that is provided.
Make sure Set Screw (8D) is securely tightened to Handle (8C).
7E
7B
7A
7C
7D
8D
8C
8D
8E
8A
8B
ENGLISH
9
9E
9 SPOUT BODY ATTACHMENT
Insert Lift Rod (9A) into hole at the back of Spout (9B). Place Plastic Seal Ring (9C)
against the bottom of Spout Base (9D). With Spout (9E) facing forward, carefully install
the Lift Rod (9A) and Shank (9F) through the center hole of sink (9G).
10
10A
10 SECURING SPOUT BODY
From underneath sink, secure Spout Body (10A) by placing Metal Washer (10B) and
7
threading Long Nut (
/
16
bumps on Metal Washer (10B) are facing up. Make sure Lift Rod (10E) moves freely.
Firmly hand tighten Long Nut (10C). Secure Long Nut (10C) not to exceed a
Caution: Do not over tighten!
3
9A
9D
9C
9F
9G
10E
10D
10B
10C
Hex.) (10C) onto Mounting Post (10D). Make sure that the
9B
1
/
turn.
4

Publicité

loading