Télécharger Imprimer la page

Palram Lean To Grow House 8x4-Hybrid Mode D'emploi page 3

Publicité

IMPORTANT
Please read
these
instructions carefully before you start to assemble this greenhouse.
Keep
these
instructions
in
a
safe
place
for future
reference.
»
Customer
Service
For
assistance
with
assembly or for replacement parts
-
please log
onto our website
or
call
our
service line
(number
is
on
the title
page).
Additional information
can be
found
at
our website: www.palramapplications.com
»
Safety Advice
It
is
of utmost importance to
assemble
all
of
the parts according to the directions.
Do
not
skip any step.
We
strongly recommend
using
work
gloves during assembly.
Always wear shoes and safety
goggles when working with extruded aluminium.
If using
a
step ladder or power tools ensure
that you follow the manufacturer's
safety advice.
Do
not touch overhead power cables
with
the aluminium profiles.
Do
not
attempt
to assemble the greenhouse
in
windy or wet conditions.
Dispose
of
all
plastic
bags. Keep
them out of
reach
of
small
children.
Keep
children away from the assembly
area.
Do
not
lean
against or push the greenhouse during construction.
Do
not position your greenhouse
in an area
exposed to excessive wind.
Do
not
attempt
to assemble this greenhouse if you
are
tired,
have
taken drugs or
alcohol or if you
are
prone to dizzy
spells.
Hot items such
as
recently
used
grills,
blowtorches
etc.
must not
be
stored
in
the
greenhouse.
Ensure
there
are no
hidden
pipes or cables
in
the ground before
inserting the
pegs.
This
product
is
designed to
be used
mainly
as
a
greenhouse.
»
Care &
Maintenance
When
your greenhouse
needs
to
be
cleaned,
use
a
mild detergent solution and
rinse
with
cold
clean water.
DO NOT use
acetone, abrasive cleaners or
other
special
detergents to
clean
the clear
panels.
It
is
recommended to check periodically that roof
panels caps (plastic part 329
&
profile
981) are set in place.
»
Tools
&
Equipment
Tape
measure
Work gloves
Silicone spray
/
Lubricant
Phillips head screwdriver
Leveler
Rubber
mallet
Adjustable Spanner /Wrench
T001
-
Special
tool for
Screws
411
and nuts
412
»
Before
Assembly
Selecting
a
site:
-
The
greenhouse must
be
positioned
and fixed on
a
flat
level surface.
-
Choose
a
sunny position away from
overhanging
trees.
We
strongly recommend this greenhouse
being secured
directly to
a
solid concrete
foundation.
When
doing that
use
the
pre
drilled
holes
in
the metal
base.
This
is a
multi-part
assembly best achieved
by
two
people.
Allow
at least
a
half
a
day
for the assembly
process.
Take all
components
&
parts
out of the
packages. Sort
the parts and check against
the contents parts
list.
Parts
should
be laid
out
close at hand.
Keep all small
parts (screws etc.)
in
a
bowl
so
they do not get
lost.
Please
note multi-sided profiles
are used in
this greenhouse.
As
a
result some holes
in
the profiles
are
not
used
during
assembly.
Please
review entire instructions before
starting.
Carry
out
the assembly
steps
in
exact order.
»
Notes
During Assembly
Please
note you install the
panels
with
the
UV
protected
side
out (marked with
"THIS
SIDE
OUT")
and peel the
film strip covering the
panels.
You
may
use
Silicon
lubricant
spray
in
order to help
you
slide
the
panels
into the profiles.
Do
not
spray
the Polycarbonate
panels.
Use
a
rubber mallet if
necessary.
During assembly you will encounter the
information
icon, please refer to the relevant
assembly step for additional comments and
assistance.
Step
16:
Peel
the film covering the
panel. Make sure
you install it
with
the
UV
protected
side
out.
Step 17:
Please
note which screw and bolt to thread
at
which of the pre-drilled
holes
(Drawing
a
& b).
Window Assembly
Step 23: Decide on the window's location before
assembly.
Window
can be
installed
in
one
of
the
indicated options.
Step 35:
In
case
the
window
doesn't closed properly,
please release
the
screws,
adjust the profile and
tighten
the
screw.
Step 45: Anchoring the greenhouse
can also be
done
by
drilling the
base
profiles and fastening it to the
ground
using
ground
screws
or
spikes (screws
and
spikes are
not supplied).
Anchoring this product to the ground
is
essential to
its
stability
and
rigidity.
It
is
required to complete this
stage
in
order for your
warranty to
be
valid.
A\
Important
Recommendations
Firmly connect the greenhouse to
a
level
position
immediately after completion of the
assembly.
In
order to anchor the greenhouse
use
the
designated manufacturer anchoring kit.
Tighten
all screws once assembly
is
completed.
Screws
411
and nuts 412 are used
thruoghout
the assembly
process.
Screws
411
are
to
be
assembled from the outside and nuts
412
from the inside of the
greenhouse.
Do
not
fasten screws and nuts
(411 &
412)
more than
23-
turns only.
Do
not
tighten them
until completion of the panels'assembly, if not specified otherwise.
However,
in
some steps,
temporary tightening of
a
few
screws may
be
needed
to prevent
a
profile from falling.

Publicité

loading

Ce manuel est également adapté pour:

Hybrid