Télécharger Imprimer la page

WIKA XTRACTO-PAD TC59-X Mode D'emploi page 13

Publicité

Les langues disponibles

Les langues disponibles

6. Commissioning, operation
Figure 1: Welding details
Fillet
weld
Fillet
weld
6.9 Tube clip welding
Attach clips at predetermined locations. Preheat area before welding, if required.
Weld the first tube clip at 100 mm (4") from the guide channel, weld only on the opposite
side of the guide channel (see figure 2).
Weld tube clip on one end only and ensure there is a loose fit (no friction)
between the mineral-insulated cable and the clip.
The tube clip should allow axial expansion of the mineral-insulated cable.
Weld clips maximum every 300 mm (12") to 450 mm (18") of run (see figure 2) alternating
on opposite sides of the sheath.
Force tube clips down after the thermocouple installation to ensure good sensor to tube
contact.
Figure 2: Tube clip welding
Fillet
weld
WIKA operating instructions model TC59-X (XTRACTO-PAD
First clip
maximum
100 mm (4")
Maximum
300 mm to 450 mm
(12" to 18")
MI
cable
Fillet
weld
)
EN
13

Publicité

loading