Télécharger Imprimer la page

Glacier bay 67513W-6A01 Guide D'installation Et D'entretien page 8

Publicité

Les langues disponibles

Les langues disponibles

Installation (continued)
9
Making the water supply
connections
Use 1/2 in. I.P.S. faucet connections (2), or use
supply line coupling nuts (3) (not included) with
a 3/8 in. O.D. ball-nose riser (1).
Use wrenches to tighten the connections. Do not
overtighten.
Operation
1
Flushing and checking for leaks
IMPORTANT: After installation is complete, remove the
aerator from the faucet (A) to ush the water lines. Do not
lose the gasket (1) in the aerator.
Ensure the faucet (A) handles are in the off
position, and turn on the water supply to check
for leaks. If you discover any leaks, check your
connections to ensure they are installed properly.
Remove the aerator and housing (if applicable).
Turn on the hot and cold handles to allow the
water to run for at least one minute. This
ushes away any debris that could cause
damage to internal parts.
Turn off the water and reinstall the aerator and
housing (if applicable).
1
3
1
8
2
A

Publicité

loading

Ce manuel est également adapté pour:

67513w-6a04Hd67513w-6a27h2100222573210022131541003002685