STORAGE
Keep away from:
Direct sunshine, rain, wind and sand.
-
-
Temperature: max. 140°F/min. 14°F
Max. relative humidity: 90%
-
TRANSPORT and HANDLING
The carrier is always liable for any damage caused
to the products entrusted to them during transport.
Thus, before preparing the unit for its installation
and commissioning, it is necessary to carry out a
complete visual inspection in order to check that
the packing cases are intact and the unit has no
apparent damage and that there is no oil or
refrigerant leakage. It is also important to verify
that the units are the ones that have been ordered.
Any damage or complaints must be reported to
MAT Industries, LLC and declared to the carrier
by registered letter within eight days of receiving
the equipment.
If there is damage to one or more components, do
not start the unit but inform MAT Industries, LLC
about the problem to find a mutually agreeable
course of action.
During transport, do not place the dryer on the ground, on the side, in order to avoid any possible problem.
Example of lifting using a forklift truck:
-
Insert the protection for the external structure of the unit, e.g. polystyrene or board sheet (A).
Ensure that the forks of the truck jut out min. 4 inches (B) from the unit.
-
Example of lifting using slings:
Place the slings as shown.
-
-
Place the rigid structures on the upper sides of the unit
in order to avoid damaging it (only when there is a point
on which the pressure acts).
Tighten the slings gradually, while ensuring that they
-
remain in the correct position.
-
Start lifting the unit.
Preferably, remove the packaging at the actual
place of installation.
The unit should be handled with great care on the
premises. Do not use any of its components as a
grip. In order to avoid any damage, it is imperative
that, during their handling, the units always remain
in the position set for their operation.
Do not leave the units in their packaging on
premises that are exposed to strong sunshine
because the ambient temperatures can affect the
triggering values of the safety devices.
The water circuit should be completely drained
before the unit is handled.
The equipment should be preferably lifted using a
forklift truck. Use a spreader bar if belts or slings
are used and ensure that there is no pressure on
the external edges of the units or the packing
case.
7