2
TIME
Knob for adjustment of time between bursts of the interval function (all the way to the left = continuous bursts / 0 second interval, all the way to
the right = approx. 60 seconds interval). An integrated LED indicator lights up as soon as the heating-up phase of the evaporator is complete.
3
MANUAL
Button for manual triggering of the combined effect. Fog burst and LED illumination continues for as long as the button is pressed. When the
button is pressed the indicator LED in the button is lit. During fog bursts, "FoG" appears on the display.
4
OUTPUT
Knob to adjust the fog burst density quantity (all the way to the left = fog output disabled / 0%, all the way to the right = maximum fog
density / 100%). An integrated LED indicator lights up as soon as the heating-up phase of the evaporator is complete.
5
COLOUR
Button to adjust the LED light colour. Press and hold the button for approximately 1 second until the LEDs are turned on, then press briefly
and repeatedly to select the desired colour (14 colour presets and automatic colour change). The LEDs are lit for approx. 5 seconds, as is
the LED indicator in the button.
6
BRIGHTNESS
Knob to adjust brightness effect (all the way to the left = blackout / 0%, all the way to the right = maximum brightness / 100%). An integrated
LED indicator lights up as soon as the heating-up phase of the evaporator is complete.
INSTALLATION
For installation on a level surface, the LED fog machine features four rubber feet on the base (Fig. A, vertical fog output) and on one side (Fig
B, horizontal fog output). For convenient transportation, a folding handle is located on the side of the housing (Fig. C).
A
Because the LED fog machine can be installed at any desired angle on a traverse, it features a top-or-bottom-loading canister tray. Load
the canister tray from the bottom if the LED fog machine is installed at an angle greater than 90°. To do this, remove the canister retaining
clamp (Fig. D), remove the canister and remove the
canister shelves from the bottom of the housing using a suitable tool (Fig. E, 4 screws, screwdriver PH2). Now install the canister shelves on
the top side of the housing in the designated position (Fig. F), place the canister in the canister tray and secure it with the canister retaining
clamp (Fig. G). Make sure that the canister is held in place firmly.
B
C
7