4.1. Assembly
Follow the steps below to assemble Jacto GM-12 granular spreader.
• Ensure the dosage regulating valve is aligned with the regulating outlet.
regulating bushing
• Also, ensure the articulation assembly looks the same as the assembly below.
articulation
assembly
• Fit the locking pin and the cotter pins to fix the applicator lever and check
again the alignment of the dosage regulating bushing.
1)
Spreader
handle
lock pin
cotter pins
• Remove the tank fairing;
1)
OBS.: Jacto GT-18 tank is sold separately.
• Insert the hose through the clamp, fit it into the tank outlet, and tighten the
clamp.
1)
tank outlet
clamp
hose
• Insert the other end of the hose through the fairing and screw it back onto
the tank.
regulating
outlet
2)
2)
fairing
2)
ATTENTION!
Do not over-tighten any parts.
• Then, insert the hose through the clamp into the
the clamp.
1)
hose
hose clamp
delivery tube
4.2. Adjusting the strap
The equipment tank has an anatomical shape, providing greater comfort to the
operator. With a simple strap adjustment, the operator can position the equip-
ment correctly on his back.
• Pull the straps down to adjust them as needed.
A
pull strap
down
5. Operating the equipment
ATTENTION!
Do not operate your equipment if parts are missing.
Replace any defective parts before use. Misusing the
equipment can result in malfunction and personal injury.
ATTENTION!
When operating the spreader, wear personal protective
equipment (PPE), such as boots, gloves, protective
eyewear, and a face mask.
delivery tube
and tighten
2)
B
strap lock
11/29