Application
Operation is possible in conjunction with:
- Pressurized storage heaters
- Thermally controlled instantaneous heaters
- Hydraulically controlled instantaneous heaters
Operation with low-pressure storage heaters
(displacement water heaters) is not possible.
Technical data
• Max. flow
• Flow pressure
- min.
- recommended
- greater than 72.5 psi, fit with pressure reducing
valves
• Max. operating pressure
• Test pressure
• Temperature
- max. (hot water inlet)
• Water connection
Notes
- An access panel must be provided for access to
hose connections.
- Major pressure differences between cold and hot
water supply should be avoided.
Installation
Layout dimensions to establish proper clearances, see
dimensional drawing on page 1.
Flush pipes thoroughly!
Side valves
• Valve marked with "L" (left close) on the top edge of
the headpart (A) with blue tape should be mounted
on the right (cold water) side, see fig. [1].
• Valve marked with "R" (right close) on the top edge
of the headpart (A) with red tape should be mounted
on the left (hot water) side.
1. Screw the mounting set (B) to the bottom of the
thread of the side valve (C), see fig. [1].
Make sure that the rubber washer (B1) is on the top
of the fiber washer (B2).
2. Insert the side valve (C) through the basin hole from
below.
3. Place the escutcheon O-ring (D1) on the basin and
screw down the escutcheon (D) until it stops.
4. Screw the cap (E) down to the escutcheon (D).
All manuals and user guides at all-guides.com
approx. 50 L/min or 13.2 gpm
7.25 psi
14.5 - 72.5 psi
145 psi
232 psi
176 °F
cold - Right hand
hot - Left hand
English
5. Secure the handle (F) or lever (G) to the stem of the
ceramic cartridge (A).
It is recommended that the lever handle (G) be
installed so they point away from the spout when in
the off position.
If the gap between the handle and the cap is ex-
cessive, back off the cap (E) and the escutcheon (D)
to minimize the gap.
6. Tighten the mounting set (B) from below to secure
the valve.
Spout, see fig. [2].
1. Place the O-ring (I1) and the escutcheon (H1) on the
basin.
2. Insert the spout (H) through the escutcheon (H1)
and basin.
3. Secure the spout with the mounting set (I).
4. Install the connector (J) to the spout.
Connect faucet, see fig. [3].
Install elbows (K) onto the diverter (L).
Connect the side valves to the water supply. Insure the
supplied washers are used for all connections.
The cold water supply should be connected on the
right side valve (marked blue) and the hot water supply
to the left valve (marked red).
Open cold and hot water supply and check
connections for leakage.
Maintenance
Inspect and clean all parts, replace as necessary and
grease with special grease (order no. 18 012).
Shut off cold and hot water supply.
I. Ceramic headpart, see page 2.
1. Remove handle (45 776, 45 790) and cap.
2. Unscrew the ceramic headpart (45 882 - right close,
45 883 - left close) using a 17mm wrench.
II. Flow straightener, see page 2.
Unscrew and clean flow straightener (13 934).
Assemble in reverse order.
Replacement parts, see page 2 ( * = special
accessories).
Care
Instructions for care of this faucet will be found in the
Limited Warranty supplement.
4