5
4
5
5
Wiring Channel Areas Side Wiring
Catalog No.
Page 2
CFB6G30RE, xxRCRE (2) 0.40 in [261 mm ] (4) 33 in [540 cm ] (2) 108.5 in [1778 cm ] 3.75 in [95 mm]
FIGURE
1
Table 1
End Wiring Chamber
Minimum Depth of
Chamber Volumes
Volumes
Pour
6 GANG RECESSED STEEL CONCRETE FLOOR BOX FOR ROUND
7
Catalog no.'s CFB6G30RE, CFB6G30RCRE
CAUTION: RISK OF ELECTRIC SHOCK. Disconnect power before installing or servicing.
NOTICE: For installation by a qualified electrician in accordance with national and local electrical codes, communication
8
standards, the following instructions, and any instruction included with individual devices.
NOTICE: Ensure data/communications circuits are separated from lighting/power circuits in accordance NEC and CE code
requirements.
2
Use with CFBS1R8CVRxx series round covers.
Use with CFBS1R8FFCVRxx series round furniture feed covers. CFBS1R8FF6GDIVKIT partition system required for multi-service
installations.
1
Use with CFBHUB2, 2 in. metallic conduit hubs, CFBHUB125PVC, 1-1/4 in. non-metallic hubs, or CFBHUB200PVC, 2 in.
non-metallic hubs may be used in place of knockout plates as needed.
Use with CFB8RCVRR075 stackable pre pour rings to increase concrete thickness over the box. Each ring adds 3/4" of concrete
over the box.
BEFORE CONCRETE POUR, SEE FIGURE 1
1.
Remove four #8-32 pan head screws [1] from top corners of floor box assembly and retain.
2.
Remove transition [2] and mounting plate [3] assemblies from box and retain.
3.
Make conduit connections in accordance with application and applicable electric codes. 2" trade size conduit hubs,
3
(CFBHUB2) or PVC conduit hubs (CFBHUB125PVC, CFBHUB200PVC) may be used in place of knockout plates [4] as needed.
4.
For same side feed-thru wiring, remove low voltage dividers [5] as necessary.
5.
Reinstall transition [2] on top of the mounting plate assembly [3]. Secure using #8-32 pan head screws [1] in corners.
6.
Cover visible openings and screws that penetrate the floor box with tape to prevent concrete from entering the box.
7.
Install leveling screws [6] as shown in Figure 1. Level box as required, positioning the floor box with the temporary cover [7]
even with slab level. Use leveling screws [6] and wire to keep the floor box from moving during concrete pour. See Table 1
5
for minimum depth of pour.
8.
Verify that flat head screws [8] holding the temporary cover [7] are secure. After tightening, cover screw heads and cover
edge with tape. Grease to aid in removal later.
9.
Pour concrete flush to the top of the temporary cover [7].
10
6
9
Wiring Device - Kellems
Hubbell Incorporated (Delaware)
40 Waterview Dr.
Shelton, CT 06484
1-800-288-6000
www.hubbell-wiring.com
PD-3007
3/23
COVERS - Installation Instructions
CFBHUB2
Conduit Hub
2 in. trade size
(sold separately)
CFBHUB125PVC
PVC Conduit Hub
1-1/4 in. trade size
(sold separately)
Page 1
ENGLISH
3"
3-3/4"
CFB6G30RE