Télécharger Imprimer la page

Klarstein 10031436 Mode D'emploi page 41

Publicité

Les langues disponibles
  • FR

Les langues disponibles

All manuals and user guides at all-guides.com
Possible plug-in connections (depending on the model):
Step 5: Completing the Installation
To complete the installation and system checkout requirements, the following steps must be performed:
• Check the thermostat position. Make sure the thermostat is routed through the holding guide and is not
touching any metal surface.
• Make sure the guide louver and the filters are properly positioned in the ceiling grille.
• Secure the ceiling grille to the ceiling assembly frame with 4 screws. (see picture).
• Install screw caps into four screw holes.
• Switch on the power supply and check the unit work or not.
Frame
Ceiling grille
4 Screws and
4 Screw Caps
41

Publicité

loading