Page 6
EN_ABOUT THIS MANUAL LEGENDS FR_À PROPOS DE CE MANUEL LÉGENDES ES_SOBRE ESTE MANUAL LEYENDAS PT_SOBRE ESTE MANUAL LEGENDAS DE_ÜBER DIESES HANDBUCH LEGENDEN IT_SULLE LEGGENDE DI QUESTO MANUALE EN_Steps. Follow the steps in alphabetic order, from Step A to Step B,etc. FR_Les étapes.
Page 7
EN_BOLT INSERTION FR_INSERTION DES BOULONS ES_INSERCIÓN DE PERNOS PT_INSERÇÃO DE PARAFUSOS DE_SCHRAUBE EINSETZEN IT_INSERIMENTO DEI BULLONI EN_Several steps in this manual involve inserting F4 Bolts into the groove of Aluminum profiles as a preparation for further installation. Dia-grams above illustrate how to use such inserted bolts. F4 BOLTS AND NUTS Part No.
Page 8
BOX 1/2 BOX 2/2 Part No. Part Qty. Part No. Part Qty. Part No. Part Qty. 12-1 22-1...
Page 10
EN_Take the fully assembled base to the chosen site and secure the base to the ground. TIP: measure the length of the two diagonal of the base to make sure that the base is in a square shape. Use a level to make sure the secured base is at. FR_Apportez la base entièrement assemblée sur le site choisi et fixez-la au sol.
Page 11
EN_Two foundation options with pre-fabricated Base FR_Deux options de fondation avec base préfabriquée ES_Dos opciones de cimentación con base prefabricada PT_Duas opções de fundação com base pré-fabricada DE_Zwei Fundamentoptionen mit vorgefertigtem Sockel IT_Due opzioni di fondazione con base prefabbricata EN_Option 1:Corner Stakes mounted into the soil EN_Option 2:Corner Stakes mounted into concrete FR_Option 1:Piquets d'angle montés dans le sol FR_Option 2:Piquets d'angle montés dans le béton...
Page 16
Reserve 3 pieces of F4 for installing 22 & B3...
Page 19
one extra bolt F4 for part 22 later two extra bolts F4 in two grooves of part 7 for part 22 later...
Page 22
tighten the nuts on B3 after adjustment of the greenhouse two extra bolts F4 for part 22...
Page 23
one extra bolt F4 in upper groove of part 16 for part B3, the rest for part B4 B5 and B6...
Page 25
tighten the nuts on B4, B5 and B6 after adjustment of the greenhouse...
Page 28
two extra bolts F4 in part 12-1 for part B7 tighten the nuts on B3 after adjustment of the greenhouse...