Télécharger Imprimer la page

Mandik MONZUN MMS Instructions Pour L'installation page 24

Publicité

Les langues disponibles

Les langues disponibles

The control box MMS+OMM3(OMM6) can control MONZUN aggregates under the following con-
EN
ditions:
• All aggregates controlled by one box are
connected to the same phase.
Fig. 4: Connection diagram of MONZUN aggregates with the OMM3 control box
Operation
Use the lever switch (1) to select the operating mode for each individual MONZUN unit. We can
choose from three main states.
• AUTO – The unit is fully controlled by the
MMS thermostat either according
to weekly or individual required
temperatures (switching on is
signalled by indicator light (4))
• OFF
– The unit is switched off, regard-
less of commands from the MMS
thermostat
If for some reason the MONZUN unit fails to ignite (e.g. closed gas supply), the malfunction indi-
cator lights up both on the MONZUN heater and on the OMM3(OMM6) control box (5).
24
|
• All aggregates are controlled in one tem-
perature zone.
• MANUAL – The unit responds only to
I – HEATING
II – VENTILATION – The unit ventilates
VULCAN REGULATOR | Instalation, operation instractions and maintenance manual
the switch on the left side of
OMM3(OMM6) (switching on
is signalled by the light (3))
– The unit heats at
minimum output
regardless of room
temperature
regardless of room
temperature

Publicité

loading

Produits Connexes pour Mandik MONZUN MMS

Ce manuel est également adapté pour:

Monzun omm3Monzun omm6