INSTALL FLUE MOUNTING
BRACKET
DUCTED HOODS ONLY
1. Cut out and attach the "Flue Mounting
Bracket" template to the ceiling corner.
Align center of the template with centerline
from cook top. Fig 8.
2. Drill (2) 5/16" diameter holes into the ceil-
ing. Install (2) drywall anchors.
3. Assemble the flue mounting bracket, using
3.9 x 6mm flat head screws. Adjust outside
width as shown. Fig. 9.
4. Secure the bracket assembly to the ceiling
using (2) 4.8 x 38 mm mounting screws.
Fig. 10.
5. Make sure the bracket is pushed into the
corner and tight against the ceiling after
fastening screws.
DRYWALL ANCHORS
4.8 x 38 mm
MOUNTING SCREWS
INSTALL THE HOOD
Note: Remove the plastic protective film
from all exterior surfaces, decorative flues
and filters, prior to final installation.
DUCTED and NON-DUCTED
INSTALLATION
1. Hang the hood from the wall mounting
bracket. Fig. 11.
2. Secure range hood to the wall with (4) 4.8
mm x 38 mm mounting screws. Fig 12.
All manuals and user guides at all-guides.com
FIG. 10
FIG. 11
- 9 -
CENTER LINE OF COOKTOP
ON CEILING OR SOFFIT
CENTER
LINE OF
OR SOFFIT HERE
COOK TOP
- FOR LOCATION
ON WALL
3.9 x 6 mm FLAT HEAD
BRACKET SCREWS
10-7/16"
4.8 x 38 mm
SCREWS
4.8 x 38 mm
MARK CEILING
OF DRYWALL
ANCHORS
FIG. 8
FIG. 9
SCREWS
FIG. 12