Télécharger Imprimer la page

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

Operating Instructions
Series 5000 Spring Driven Hose Reels
Pre-Rinse Model Numbers:
5635 OLPSW5
Dimensions
INSTALLATION:
A flexible hose connection must be used between the hose reel inlet and the source of supply to prevent possible
misalignment and binding.
MOUNTING:
The hose reel is equipped with a universal mounting bracket so that it can be mounted on the floor, wall or
ceiling; whichever place is convenient. The hose guide arm can be moved to the position desired by removing
the screws fastening the guide bracket to the reel base. Shift the guide arm bracket so the hose comes off the
reel at the desired position and replace the screws. NOTE: For proper installation in wall mount applications, ensure
reel is mounted with inlet on the right as you are facing the reel. Failing to do so could cause latching issues.
Hose reel spring and bearings are factory lubricated and require no further lubrication.
LUBRICATION:
REPLACING HOSE: 1. Wind spool flange clockwise-facing swivel-until spring is tight.
2. Back off three turns and latch.
3. Insert hose through roller guide.
4. Connect hose fitting to swivel joint and secure hose with clamps.
ADJUSTMENTS:
To adjust spring tension, add or remove wraps of hose from the spool, one wrap at a time until desired tension is
obtained.
REPAIRS:
Extensive repairs should be performed only by an authorized serviceman or factory to avoid damage which may
void your warranty. Remove all spring tension before beginning disassembly process.
Reelcraft Industries, Inc. • 2842 E Business Hwy 30, Columbia City, IN 46725
Ph: 800-444-3134 / 260-248-8188 • Fax: 800-444-4587 / 260-248-2605
Customer Service: 855-634-9109 • reelcraft@reelcraft.com • www.reelcraft.com
All manuals and user guides at all-guides.com
A
14 3/8"
B
14"
C
9 3/4"
D
2 1/2"
E
6 1/8"
SAFETY
1. Do not use reel at higher pressures or temperatures than listed on
the back of this bulletin.
2. Remove all spring tension before beginning dissassembly process.
Form #1260-314 Rev: 5/2018

Publicité

loading

Sommaire des Matières pour Reelcraft 5000 Serie

  • Page 1 Remove all spring tension before beginning disassembly process. Form #1260-314 Rev: 5/2018 Reelcraft Industries, Inc. • 2842 E Business Hwy 30, Columbia City, IN 46725 Ph: 800-444-3134 / 260-248-8188 • Fax: 800-444-4587 / 260-248-2605 Customer Service: 855-634-9109 • reelcraft@reelcraft.com • www.reelcraft.com...
  • Page 2 Guide Arm & Roller Assembly 28 3-117440 U-bolt 500101 Base Assembly 261650-1 1/4-20 Zinc Nyloc Nut S504240 Drive Spring Assembly S400015 Main Shaft S300011 10-32 Hex Lock Nut S600080 Spray Valve S261360 Spring Case Stud 600248 360° Swivel (Optional) Page 2 www.reelcraft.com...
  • Page 3 Remueva todos los resortes de tension antes del proceso de desmontaje. Page 3 Form #1260-314 Rev: 5/2018 Reelcraft Industries, Inc. • 2842 E Business Hwy 30, Columbia City, IN 46725 Ph: 800-444-3134 / 260-248-8188 • Fax: 800-444-4587 / 260-248-2605 Customer Service: 855-634-9109 • reelcraft@reelcraft.com • www.reelcraft.com...
  • Page 4 Base Para Ensamblar 261650-1 1/4-20 Tuerca de Zinc S504240 Montaje del resorte de accionamiento S400015 Columna Principal S300011 10-32 Tuerca Hexagonal S600080 Válvula de pulverización S261360 Perno de la Caja de Resorte 600248 Giratorio de 360° (Opcional) Page 4 www.reelcraft.com...
  • Page 5 Enlevez toute tension de ressort avant de désassembler. Page 5 Form #1260-314 Rev: 5/2018 Reelcraft Industries, Inc. • 2842 E Business Hwy 30, Columbia City, IN 46725 Ph: 800-444-3134 / 260-248-8188 • Fax: 800-444-4587 / 260-248-2605 Customer Service: 855-634-9109 • reelcraft@reelcraft.com • www.reelcraft.com...
  • Page 6 U 500101 assemblage de base 261650-1 écrou Nyloc en zinc S504240 assemblage de resort S400015 arbre principal S300011 contre-ecrou hexagonal S600080 Valve de jet S261360 boulon de boîtier de ressort 600248 360° pivotant (En option) Page 6 www.reelcraft.com...

Ce manuel est également adapté pour:

5635 olpsw5