Operation
Notes:
• Before testing, insert a 9V battery (not included) and ensure the cable being tested
is not yet connected to the tester.
• Do not test live cables or any cable connected to an active device. Cables should be
directly connected to the Master Unit, and then to the Remote Unit.
Testing
Simply connect the desired cable to the unit, then switch the Sweep/OFF/
Continuity button to "Continuity" for sync testing, or "Sweep" for step-by-
step testing.
Note: During sync testing, all LEDs illuminate on the wire map at once. During step-by-
step testing, the LEDs will illuminate one at a time.
When testing uninstalled patch cable, you can leave the Main Tester and
Remote Identifier connected.
When testing installed cable, you will need to remove the Remote
Identifier from the Main Tester. Connect one end of the cable to the
appropriate connector on the Main Tester, and the other end of the cable to
the appropriate connector on the Remote Identifier.
Note: Upon switching to the desired testing mode, the LEDs on the Main Tester and
Remote Identifier will illuminate to indicate the results.
If testing DisplayPort-to-DisplayPort cables, use "A pin" side numbers
found on both the Main Tester and Remote Identifier. For DisplayPort-to-Mini
DisplayPort and Mini DisplayPort-to-Mini DisplayPort cables, use "C pin" side
numbers found on both the Main Tester and Remote Identifier.
04-226-933798.indb 3
All manuals and user guides at all-guides.com
3
4/30/2018 3:39:37 PM