Télécharger Imprimer la page

Intel Express 300T Stackable Hub Démarrage Rapide page 2

Publicité

Les langues disponibles
  • FR

Les langues disponibles

Quick Start
1
Install the Hub
• Remove the hub and parts from the box.
• Attach the enclosed brackets if you plan to
mount the hub in a rack.
• Install the Intel
in a rack or on a shelf.
• Plug in the power cord.
Connect
2
the Devices
• All ports automatically detect the speed of the
device connected to them.
• Connect PCs and print servers to the hub with
straight-through cables.
• Use a crossover cable to connect a hub to
another hub or switch.
• Use a straight-through cable to connect to
another hub or switch when port 1 is set to
MDI.
• Use only CAT 5 UTP to connect 100Mbps
devices. To connect 10Mbps devices, use CAT
3, 4, or 5 UTP.
Check the
3
Connections
• Check the port LEDs to confirm the link
status.
• A solid green LED (on the left) indicates a
valid link.
1
®
Express 330T Stackable Hub
Inte l
®
Exp ress 330
T Stac kabl e
Hub
Modu le A
MDI/
1
MDI- X
2
Status
3
Link \Acti
4
vity
5
Spee d
6
Mo dul
7
Dup lex
e B
8
9
Mod ule
10
Pres ent
11
12
13
14
15
Left
16
Link = Solid
Activ ity
Green
= Blink ing
Partit ioned
Green
= Blink ing
Orang e
Righ t
10Mb ps
= Solid
100M bps
Orang e
= Off
Shelf: Peel off the protective
backing and attach the rubber feet
to the hub.
From
straight-through
10/100
Hub
10/100
Hub
crossover
10/100
when port 1 set to MDI-X
Hub
straight-through
10/100
when port 1 set to MDI
Hub
Left (Green/Orange)
Solid Green = Link
Blinking Green = Activity
5
6
Blinking Orange = Partition
Solid Orange = User Disabled
Rack: Use the three small
screws to attach the
brackets to the hub.
Man aged
Coll isio
ns
10M bps
100M bps
Statu s
Class II
To
PC/Server
Print Server
Hub or Switch
10/100
Hub or Switch
Right (Orange)
Off = 100Mbps
Solid = 10Mbps
7
8

Publicité

loading

Ce manuel est également adapté pour:

Express 330t