Télécharger Imprimer la page

Thermolec DCC-11-BOX Manuel D'installation page 6

Publicité

Les langues disponibles

Les langues disponibles

TYPICAL INSTALLATION
Panel
Electrical
Meter
DCC-11
Main
Disconnect
Electrical
Meter
Main
Panel
DCC-11 with
METER STACK
Panel of
the Unit
EV Charger
(compatible with
DCC-11
all models)
Meter Stack
Main Breaker
DCC-11 with
MAIN DISCONNECT
EV Charger
(compatible with
all models)
DCC-11 with
Sub Panel
DCC-11
EV Charger
(compatible with
all models)
DCC INSTALLATION
STEP 1: CHECK THE PACKAGE CONTENTS
1 x DCC-11-BOX
To access our installation video, visit our website www.dccelectric.com
STEP 2: PREPARATIONS FOR INSTALLATION
1. Disconnect the main power
2. Select the DCC intended location.
- The DCC can be mounted on a ceiling or on a wall.
NOTE: The DCC controller must be mounted so that the nameplate
remains visible at all times.
Do not install the DCC:
SUB PANEL
- Outdoor.
- In a location with high level of risk.
- Nearby inflammable materials, explosives or fuels, chemical
products and vapors.
3. Before installation, check the DCC mounting position.
Wall installation
Refer to the information on the
enclosure to insure proper
installation.
1 x Ceiling
1 x Installation
mounting support
INSTALLATION VIDEO
Ceiling installation
The installation may be done
in any direction.
6
manual

Publicité

loading

Ce manuel est également adapté pour:

Dcc-11-30aDcc-11-40aDcc-11-50aDcc-11-60a