Installation of thermal insulation CAS, CAS-S, CAS-B and CAS-BS
3.5. TANK TOP COVER INSTALLATION PROCEDURE
Place the sponge cover on the top of the tank over the connection, and then the black cover for the top of
the tank over the edges of the thermal insulation (figure 8.). First place the rosettes on the connections,
then the thermometers (additional equipment) (figure 9.). Plastic rosettes are also placed on the lid of
the tank (figure 10a. and 10b.).
cover for the
top of the tank
sponge top
cover
Cover for CAS and CAS-S
connection
16
figure 8.
figure 10a.
Installation of thermal insulation CAS, CAS-S, CAS-B and CAS-BS
Plastic rosette
(place on
connections)
Cover for CAS-B and CAS-BS
connection
hot sanitary
water
Opening for sensor
Thermometer
(additional
equipment)
figure 9.
cold sanitary
water
circulation
figure 10b.
ENG