Télécharger Imprimer la page

Publicité

Liens rapides

COMPACT STAGE
Setup Guide

Publicité

loading

Sommaire des Matières pour G4M 259523

  • Page 1 COMPACT STAGE Setup Guide...
  • Page 3 Warnings WARNING! • Inspektera varje komponent noggrannt för att kolla efter skador och slitage osv. innan du börjar. ADVARSEL! • Inspektera den ihopmonterade scenen noggrannt innan varje användning, för att försäkra dig om att alla • Læs og tjek, at du forstår brugsanvisningen før du begynder monteringen. •...
  • Page 5 Contents Checklist COMPACT STAGE PLATFORM 1MX1M STAGE HANDRAIL 2M OR 1M STAGE STEPS 40CM OR 60CM COMPACT STAGE PLATFORM CLAMP STAGE HANDRAIL HOLDER STAGE PLATFORM LEVELER...
  • Page 6 Contents Checklist STAGE HANDRAIL CLAMP STAGE PLEATED CURTAIN 250X60 OR 104X60 OR 205X40 OR 105X40 Tools Required ALLEN KEY, SIZE 3 - STAGE PLATFORM LEVELER ALLEN KEY, SIZE 6 - STAGE STEPS ALLEN KEY, SIZE 8 - STAGE HANDRAIL HOLDER...
  • Page 7 Construction STEP 1 STEP 2 CLICK Place your Compact Stage Platform upside down and fold out the legs until you hear a ”click”. This lets you Two persons are required to turn the staging upright. Never manoeuvre stage platforms alone. know they are secured in position and ready for use.
  • Page 8 STEP 3 STEP 4 When all four legs are folded out, turn the Compact Stage Platform over and use the wingnuts to adjust Slide a Stage Platform Leveler into the mounting rail of one of the Compact Stage Platforms, midway along the height of your legs between 40 to 60cm.
  • Page 9 STEP 5 STEP 6 Use 2 x Compact Stage Platform Clamps to attach the two Compact Stage Platforms. Slide the clamps in at When taking down the Compact Stage Platforms shorten the legs and lock them in place. Push the brace bars each end as shown above.
  • Page 10 Attaching Handrails STEP 1 STEP 2 To attach Stage Handrails to your Compact Stage Platforms, first slide a Stage Handrail Holder mounting Slide the Stage Handrail down in to the Stage Handrail Holders. Once in place tighten the bolts on the point into the mounting rail of your Compact Stage Platform.
  • Page 11 STEP 3 Use a Stage Handrail Clamp to join and secure two Stage handrails. Loosen the Handrail Clamp and place it against the two handrails. Rotate the rear of the Handrail Clamp so that it sits behind the two Handrails. Tighten the bolt on the Handrail Clamp in a clockwise direction.
  • Page 12 Attaching Steps STEP 1 STEP 2 To attach either 20 or 40cm Stage Steps to your platform, loosen the metal arms on the steps at their base so Turn the arms until they line up with the platform rail and slide your connection blocks in to the rail, so that they can be turned freely and remove the bolts from the end of the arms to release the connection blocks and they are aligned with the arms.
  • Page 13 Attaching Skirts STEP 1 STEP 2 To attach skirts to your platform take a pack of skirt mounts and affix them to the edge of the platform above Use the velcro on the skirts to fix the skirt to the skirt mount. the rail, evenly spaced and using five per metre.
  • Page 14 Note on Uneven Ground Do not build the Compact Stage system on an inclined surface as this can impact stability and integrity. Only build on an appropriately flat and solid surface. NOTES • Maximum Load: 300kg/m2 • Platform Weight: 18.7kg •...
  • Page 16 If you have any more questions about this product, please do not hesitate to contact the Gear4music Customer Service Team on: +44 (0) 330 365 4444 or info@gear4music.com KETTLESTRING LANE | YORK | YO30 4XF | UNITED KINGDOM • LAHNSTRAßE 27 | 45478 MÜLHEIM AN DER RUHR | DEUTSCHLAND • WWW.GEAR4MUSIC.COM...