TEMPUR EASE Manuel Du Propriétaire page 9

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

installation guide
STEP 7
Carefully flip the base over on to its legs. Important: Two people are
required to move the bed base. Do not drag across the floor. Do not rest
frame on its side, excessive pressure may damage the legs.
STEP 8
Plug the Power Cord into a power source.
A surge protector is recommended.
STEP 9
Ensure that batteries are correctly installed. Quickly test remote
functions to verify proper setup before placing mattress on base. Return
the base to a FLAT position before placing the mattress on top.
STEP 10
Slide the left side of the Mattress Retainer Bar into the bracket.
Pull the retainer bar to the opposite bracket and secure the right
side.
For customer support, call Customer Service: U.S. 1-800-499-1965 | Canada 1-800-268-4414
Setup is now complete!
Test all functions on remote.
7

Publicité

Table des Matières
loading

Table des Matières