Télécharger Imprimer la page

Garland PRESS 191 AE Manuel D'instructions page 28

Publicité

English
Always carry out all the maintenance
work with the machine unplugged from
the mains.
7.1. MAINTENANCE
This pressure group does not need any maintenance
work. We strongly recommend a general visual control
to check for water leakages, loose parts and to check
all the connections. This way, you shall ensure a long
lasting usage of the machine. Should you detect any
anomalies, rework or take the machine to your nearest
service agent.
28/92

Publicité

loading

Ce manuel est également adapté pour:

Press 391 ae