Télécharger Imprimer la page

Ebinger Leader 25 Manuel De Mode D'emploi page 15

Publicité

Les langues disponibles
  • FR

Les langues disponibles

DE
EN
FR
ES
IT
Preparing the water supply and starting the sprinkling
process
Now connect the available water supply with the LEADER (fig.8).
Tip: The diameter of the supply hose should always be one hose
size larger than the hose on the reel irrigator (see technical data,
chapter. 3).
The sprinkling process starts and the sprinkler trolley is pulled in
fig. 8
by the hose.
Water pressure: min. 2.5bar - max. 4,5bar
The speed of the sprinkler may be adjusted continuously. A swivel
valve (fig. 9) is located on the water turbine for this purpose:
Turn off valve = slower = intensive sprinkling
Open valve = quicker = reduced sprinkling
The circular movement of the sector sprinkler can be adjusted as
fig. 9
required. The spray jet can be "interrupted" as required using the
adjusting screw (see chapter: Setting the sector sprinkler).
When the sprinkling is completed, the sprinkler trolley activates the
automatic shut-off by pushing the activation handle on the front of
the hose reel upwards (fig. 10).
This closes the valve and the water supply is interrupted.
Sprinkling is now terminated.
Attention: Always open the valve in a depressurised state.
Otherwise there is a risk that the valve seal will shift in position and
the valve will not close properly when triggered.
fig. 10
15

Publicité

loading

Ce manuel est également adapté pour:

450721