FIGURE A - Flat Flange Installation - FLUSH (shown):
Adjust Flat Flange flush to tile surface. Minimum
ceramic tile thickness 3/16" [4.8 mm].
Apply Gasket or Grout or
Silicone Compound to Joint
Flat Flange Cover
Ceramic Tile
Concrete
Floor Box
Jack Screw
Pour Depth - See Table below
Ceramic Tile or Laminate Flooring
Pour Depth Flat Flange Cover
Floor Box
CFB10G55E, xxCRE 5-1/2"
610GCCVRxx
FIGURE B - Flat Flange Installation - SURFACE (shown):
Adjust Flat Flange flush to tile surface. Minimum
flooring thickness 1/8" [3.2 mm].
Apply Silicone
Flat Flange Cover
Compound to Joint
Ceramic Tile
Concrete
Floor Box
Jack Screw
Pour Depth - See Table below
VCT, Ceramic Tile or Laminate Flooring
Pour Depth Flat Flange Cover
Floor Box
CFB10G55E, xxCRE 5-1/2"
610GCCVRxx
FIGURE C - Flush Flange Installation - FLUSH (shown):
Adjust Flange flush to tile surface. Minimum
ceramic tile thickness 3/16" [4.8mm].
Apply Grout or
Flush Flange Cover
Silicone Compound to Joint
Ceramic Tile
Concrete
Floor Box
Jack Screw
Pour Depth - See Table below
Ceramic Tile
Floor Box
Pour Depth Flush Flange Cover
CFB10G55E, xxCRE 5-1/2"
610GTCVRxx
FIGURE D - Flush Carpet Installation - FLUSH (shown):
Adjust Tile Flange flush to finished surface.
Cut 6-1/8" (15.7 mm) X 10-3/4" (27.3 mm) Carpet Opening
for FLUSH and FLAT flange styles
Apply Grout or
Silicone Compound
Carpet
to Joint
Concrete
Floor Box
Pour Depth - See Table below
Carpet Concrete
Pour Depth Flush Flange Cover
Floor Box
CFB10G55E, xxCRE 6"
610GTCVRxx
FIGURE E - Flat Flange Carpet Installation - SURFACE (shown):
Adjust Flat Flange flush to Carpet surface.
Cut 6-1/8" (15.7 mm) X 10-3/4" (27.3 mm) Carpet Opening
for FLUSH and FLAT flange styles
Gasket
(Compressed)
Carpet
Concrete
Floor Box
Pour Depth - See Table below
Carpet
Pour Depth Flat Flange Cover
Floor Box
CFB10G55E, xxCRE 5-1/2"
610GCCVRxx
FIGURE F - Flush Flange Installation - FLUSH (shown):
Adjust Tile Flange flush to finished surface.
** 1" Concrete over box requires additional stackable covers,
24GEXTENDCAP2PK, sold separately
Apply Grout or Silicone
Finished
Compound to Joint
Concrete
Concrete
Floor Box
Pour Depth - See Table below
Finished Concrete
Conc. over Box Pour Depth Flush Cover
Floor Box
CFB10G55E, xxCRE 1/2"
6"
Page 3
CFB10G55E, xxCRE 1" **
6-1/2" **
AFTER CONCRETE POUR
CAUTION: Temporary concrete covers are intended to keep concrete residue from entering box during pour and are not
intended to support loads. Replace with permanent flange/ cover immediately after concrete has hardened or temporarily
reinstall concrete metal cover [3].
9.
After concrete has hardened, remove temporary concrete metal cover [3] and plastic cover [4]. Retain these temporary
covers.
Flush Flange Cover
10.
Use wiring channel [8] for feed through. Wiring channel areas given in Table 1. (Wiring channel cover may be removed for
feed through applications.)
11.
Pull and dress wires. If grounded metallic conduit is used, connect green grounding lead [9] to grounding terminal on
receptacle. For a non-metallic conduit system, pigtail a separate grounding wire to ground both box and receptacle.
12.
Install devices using appropriate floor box mounting plates (FB10MPNEMAxx and/or FB10MPxx), sold separately. Use blank
plate (FB10MPBNK) where no device is installed. All devices are to be installed in accordance with manufacturer's
Jack Screw
instructions.
13.
Reinstall wiring channel cover [8], if removed. CAUTION: Energizing the electrical system without the wiring channel cover
in place may result in an electrical shock hazard!
14.
Attach Floor box cover to complete the assembly, following the instructions provided with the cover.
Flat Flange Cover
Jack Screw
Flush Flange Cover
Jack Screw
610GTCVRxx
610GTCVRxx