Télécharger Imprimer la page

Publicité

Les langues disponibles

Les langues disponibles

Liens rapides

The aluminum railing that combines STYLE, STRENGTH and LONG LIFE.
1
2
3
4
FIGURE 1.1
POST MOUNTING SPINDLE INSTALLATION
A
B
A
B
3"
2"x 2" POST
3"x 3" POST
3
"
/
2
4
A
Measure down 3" (for 2"x2" universal post) or 2
universal post) from top of post and mark with horizontal line.
This determines the position of the top of the mounting spindle.
B
FOR HORIZONTAL RAILING APPLICATIONS
Align the top part of the spindle fitting to the horizontal lines
marked on post. Center spindle fittings by measuring an equal
distance between left and right sides of post.
Mark first hole, drill, and secure spindle with screw. Level
spindle, mark next hole, drill, and secure. Do the same for the
rest of screws.
C
FOR STAIR RAIL APPLICATIONS
The position of the fitting varies depending on the degree of the
stairs. You must place the railing and fitting at the height wanted
and mark with a pencil the installation height at the bottom of
the fitting.
Place the fitting against the pencil mark, center same and make
holes with a
" drill.
1
8
You can now fasten the fitting to the post.
Guarantee Coverage
Only the original consumer buyer receives from Imperial Kool-Ray a guar-
antee starting from the date of purchase and covering the following points
within the normal use of the product:
Material and manufacturing defect: 20 yrs
Paint finish parts: 5 yrs
Plastic parts: 2 yrs
INSTALLATION INSTRUCTIONS
5
FIGURE 1.2
ANGULAR ADAPTOR INSTALLATION
Post
C
Poteau
C
" (for 3"x3"
3
4
Post
Poteau
The Guarantee Does Not Cover
The guarantee is valid for the original consumer buyer only. The guarantee
excludes damages caused by a faulty installation, abuse or wrong usage of
the product, caused either by the contractor, the service company or the
buyer himself. Imperial Kool-Ray cannot be held responsible for labor cost
and/or damages incurred during the installation, repair or change, nor for
resulting unforeseen damages. Defects or damages caused by the use of
parts other than original Imperial Kool-Ray parts cannot be covered by the
guarantee as well as the use of an inappropriate anchor to your surface.
8
7
6
Installation anchors are not included in "any" post package. Speak with
a store sales associate concerning available mounting anchor options.
Place half moons side by side at 1
STEP 1:
for 1500, 5000 and Empire series from top
and screw to post or 1" for Imperial series
from top and screw to post.
Find desired angle and align
STEP 2:
adapter and spindle fitting with bottom of
half moons. Drill and screw to post.
GUARANTEE
1
Position the posts at the appropriate locations and place the base
of the posts at 1
" (
" if post is installed near a wall) from the
1
1
2
2
outside edge of the surface.
2
Fix the appropriate spindle fittings to post with 1
If the surface is not level, you can lower the fittings as needed.
NOTE: for Post Mounting Spindle, see figure 1.1 and for Angular
Adapter, see figure 1.2
3
You need two different posts for a stairway installation: a
stair post at the base and a mounting post at the top of the
stairway. Do not install the spindle fittings immediately.
Simply mark on the post the height where the spindle fittings
must be screwed depending on the position of the railing.
NOTE: For stair post applications see figure 1.1.C
4
Join the railing to the fitting system by holding it firmly against
the post.
5
Fasten the top and bottom railing on each side with
NOTE: for Glass Railing Systems, see figure 2.1
6
When all sections are fastened, you can align and adjust your
installation. Fasten each post to the surface using appropriate
mounting anchors.
NOTE: The use of shims may be required to
level post.
7
Once assembly is done, snap the rivet-covers into place and tap
with a rubber hammer.
8
Complete your installation by installing the base cover and caps
to the posts.
FIGURE 2.1
GLASS RAILING SYSTEMS INSTALLATION
1
"
2
Once the railing is mounted as normal between 2 posts or 2 walls
or combination thereof, the glass can then be installed. The glass
is installed in its place by inserting the top of the glass & moulding
into the handrail and then lowering it into place onto the bottom
support track. Once it is in place and centred, a firm pressure needs
to be applied to the glass pushing it down against the bottom track.
While the pressure is being applied the glass is anchored into place by
using the
" natural screws (KR7539) by either putting them into the
1
2
guide holes or by making new holes where required screwing into the
handrail and into the top moulding of the glass. (3 to 4 screws should
be used depending on the width of the glass.)
Once the glass is installed, the rivet covers can be put on as normal to
complete the installation.
Claims
A replacement part will be supplied free of charge to be installed by yourself.
To place a guarantee claim, you have to write to:
Contacts
40, rue Industrial Park St., Richibucto, NB E4W 4A4
(T) 1.800.361.3956
1
" screws.
4
" screws.
1
2

Publicité

loading

Sommaire des Matières pour Imperial Kool-Ray

  • Page 1 Plastic parts: 2 yrs resulting unforeseen damages. Defects or damages caused by the use of (T) 1.800.361.3956 parts other than original Imperial Kool-Ray parts cannot be covered by the guarantee as well as the use of an inappropriate anchor to your surface.
  • Page 2 être installée par vous-même. Pour loger une réclamation de normale du produit: service ou de l’acheteur. Impérial Kool-Ray Inc. n’est pas responsable des frais garantie, écrivez à: Matériaux et défaut de fabrication: 20 ans de main-d’oeuvre et/ou des dommages encourus au cours de l’installation,...