INSTALLATION
1.
General dimensions
The installation of rigid 1/2'' copper pipes are required
prior to the installation of this column. The pipes should
be installed vertically at a distance of 5 7/8'' center to
center (fig.1). The hot and cold male water supply con-
nectors (1/2''NPT) should be installed horizontally and
should protrude 1 3/16'' from the finished shower wall.
The height of the connectors will depend on desired
height of shower column.
The decorative cover plates have a diameter of 2 3/8''.
Ensure that the opening for each connector on finished
wall does not exceed 1 3/4''.
[974.00]
38 3/8"
Flange Braket
Crochet de la bride
Min. [150.00] 5 7/8"
Max. [167.40] 6 9/16"
1/2'' copper pipes (x4)
Tuyaux en cuivre
Brackets (x4 )
Crochets
2x4 wall studs (x4)
Colombages
HOT
COLD
WATER
WATER
EAU
EAU
CHAUDE
FROIDE
FRONT VIEW
VUE DE FACE
lnside shower base
l'intérieur de base de douche
Dimensions générales
L'installation des tuyaux rigides 1/2'' de cuivre est nécessaire avant
l'installation de cette colonne. Les tuyaux doivent être installés verticale-
ment à une distance de 5 7/8'' centre à centre (fig.1). Les connecteurs
d'alimentation d'eau mâle chaud et froid (1/2'' NPT) doivent être instal-
lés horizontalement et devraient dépasser la paroi de douche fini 1
3/16''. La hauteur des connecteurs dépendra de la taille souhaitée de
la colonne de douche.
Les plaques de recouvrement décoratifs ont un diamètre de 2 3/8''.
Assurez-vous que l'ouverture pour chaque connecteur sur le mur fini ne
dépasse pas 1 3/4''.
Finished wall
Mur de finition
[30.00]
1 3/16"
SIDE VIEW
VUE DE CÔTÉ
Fig.1