STEP 3
(STAND-ALONE INSTALLATION)
1)
Position the pump unit a minimum of
with the inlet facing away from the wall. Attach the bellows to the
inlet using the worm drive clamp provided.
2)
Place the toilet in front of pump unit aligning the discharge of the
toilet with the inlet of the pump unit. Make sure that the bellows
will bridge the gap adequately for
tank should be a minimum of
3)
Lightly mark the locations of the pump unit, toilet and closet
bolt locations on the
of the pump unit and the bottom and sides of the toilet tank to
ensure against interference from pipe runs later.
4)
Remove the toilet from the pump unit and set it aside.
Connect the rear discharge toilet to the front inlet of the Qwik Jon® Choice via hose clamps. Ensure the connec�ons are
according to local, regional, and state codes.
1/8"
(3 mm)
from the wall
installation. The toilet
1/2"
(13 mm)
from the wall.
Lightly mark the wall with the height
© Copyright 2020 Zoeller Co. All rights reserved.
ROUGH-IN
(BEHIND THE WALL INSTALLATION)
1)
Installing the pump unit behind a wall will require an
extension kit (P/N 10-2123) sold separately.
2)
Place the toilet assembly a minimum of
the wall and mark the closet bolt locations on the floor.
3)
Measure the appropriate length of 3-1/2" Schedule
PVC
length. See sketch below.
4)
Set toilet aside.
precautions to ensure that toilet does not tip over and break.
- 6 -
pipe provided with the extension kit and cut it to
Toilet assembly is top heavy. Take special
1/2"
(13 mm)
from
40