15-5/8" (397 mm)
20-3/16"
(513 mm)
6"
2" NPT
(152 mm) 24"
Tap
18"
(457 mm)
Wall
Floor
Roughing-In
• Roughing-in dimensions are identical if using an optional 3"
outlet spud.
• The urinal complies with ADA requirements when the rim is
mounted no higher than 17" (432 mm) from the finished floor.
1. Prepare the Site
NOTE: If a pre-existing waste pipe will be used and will result in an
acceptable rim height (refer to the rough-in dimensions), follow the
retrofit installation instructions.
For Retrofit Installations
Turn the water supply line off, remove the existing urinal, then
cap off the water supply line inside the wall.
For New Installations
Install waste pipe as necessary to conform to the roughing-in
dimensions.
Install adequate support framing for the wall hangers as needed.
Kohler Co.
All manuals and user guides at all-guides.com
6-3/4" (171 mm)
Wall Hangers
14"
(356 mm)
16-1/8"
(410 mm) to
Center of
Hanger Slots
(610 mm)
15" (381 mm)
2" NPT Tap
1/4"
(6 mm)
Spud Detail
3
29-5/8"
(752 mm)
6"
(152 mm)
1048745-2-F