Télécharger Imprimer la page

Haier MRV 5 Instructions D'installation page 11

Pompe à chaleur système

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION INSTRUCTIONS
Dimensions and Service Clearances
Space requirement for installation
• There should be no obstacles within 78.7 in. (2000mm) above the top of the outdoor unit.
• Keep the area from the base to 35.4" clear of any obstacles.
• Multiple outdoor units should be installed in order of size so that the smallest unit is farthest away from the first piping
branch fitting.
1. Single Installation
2. Combinations installation
Unit can be installed in the same or opposite direction.
31-5000572 Rev. 1
78.7 in
Air Outlet
35.4 in
>7.9 in
>11.8 in
Back
>11.8 in
Left
>11.8 in
>11.8 in
Front
Right
>39.4 in
>11.8 in
>39.4 in
11

Publicité

loading