Fleurco STAK DUO Guide D'installation page 13

Table des Matières

Publicité

ROUND BASIN PLUMBING ALTERNATIVES BY FLEURCO
ALTERNATIVES DE PLOMBERIE AVEC LE BASSIN ROND PAR FLEURCO
The below dimensions are only applicable when using the Fleurco plumbing models in the outlet location description.
Les dimensions ci-dessous ne s'appliquent qu'en cas d'utilisation des modèles de plomberie Fleurco spécifiés dans la description de
l'emplacement de la sortie d'eau.
5
1
"
2
OUTLET LOCATION
EMPLACEMENT DE LA
SORTIE D'EAU
VAN-PTRAP-**
DRAIN: VAN-DRAIN-**
10
"
8
BASIN WITHOUT
APRON
BASSIN SANS
TABLIER
10
FINISHING
Install the drywall to conceal the studs and reinforcement. Tape over the joints, apply joint compound, sand the
compound down to achieve a smooth surface ready to paint.Once you have completed your finished wall, locate
your previously installed reinforcement and drilling line (D) according to your plumbing installation.
FINITION
Installer le panneau de gypse pour cacher les montants et le renfort. Appliquer du ruban sur les joints puis appliquer le
composé à joints, poncer le composé pour obtenir une surface lisse prête à peindre. Une fois votre mur terminé, localiser
votre renfort précédemment installé et votre ligne de perçage (D) selon votre plomberie.
5
1
"
2
OUTLET LOCATION
EMPLACEMENT DE LA
SORTIE D'EAU
VAN-BOTTRAP-**
DRAIN: VAN-DRAIN-**
10
"
8
BASIN WITHOUT
APRON
BASSIN SANS
TABLIER
COVER THE STUDS AND FINISH THE WALL
COUVRIR LES MONTANTS ET FINIR LE MUR
D
2"
5
1
"
2
OUTLET LOCATION
EMPLACEMENT DE LA
SORTIE D'EAU
VAN-PTRAP-**
DRAIN: VAN-DRAIN-**
2"
10
"
8
BASIN WITH
APRON
BASSIN AVEC
TABLIER
SOLD SEPARATELY
2"
VENDU SÉPARÉMENT
LVSTBxx-RD-** | LVSTBxx-AP-RD-**
5
1
"
2
OUTLET LOCATION
EMPLACEMENT DE
LA SORTIE D'EAU
VAN-BOTTRAP-**
DRAIN: VAN-DRAIN-**
10
"
8
BASIN WITH
APRON
BASSIN AVEC
TABLIER
2"
13

Publicité

Table des Matières
loading

Table des Matières