Télécharger Imprimer la page

HyLoft Tire Loft Instructions D'assemblage page 3

Support de rangement

Publicité

Les langues disponibles

Les langues disponibles

2
PRE-DRI L L REMA I NI NG M OU N T I N G H OL ES
Make sure that Side Frames are perfectly vertical using a level and pre-drill into the wall studs
through the remaining 6 mounting plate holes using a 3/16"(5 mm) drill bit.
3
AT TACH REM A I N I N G L AG SCREWS
Insert remaining Lag Screws(B) in to pre-drilled holes using a 7/16" (11 mm) nut driver
or socket wrench. Do not fully tighten at this time.

Publicité

loading