Complete the electrical wiring.
・Place chassis assembly onto the bottom bracket.
・Connect power cable from hand dryer to power supply in the junction box
(confirm with certified electrician).
・Place connection point into the junction box.
・Hang chassis assembly onto the top bracket.
※Make sure all electrical wiring is placed away inside the junction box.
Bracket (Top)
Junction box
(Actual Placement)
Connection point
Bracket (Bottom)
Chassis Assy
Bracket (Top)
Place mounting platform
onto mounting bracket hooks.
Junction box
(Actual Placement)

Function Test

Checking after installation
Test the product as follows after the installation is complete.
First peel off the seal on the filter.
(The seal is used to protect the filter from scratches during
shipment; it is no longer needed.)
Air nozzles
Peel off the seal
1.
Check the circuit breaker
Turn the circuit breaker ON.
2.
Check the functionality
Place your hand under the outlet nozzles to see if air blows out.
After trial run
After you check the functionality by trial run, give the Instruction
manual (with warranty) to the customer, and explain how to use
and maintain the product.
STEP 3
Mount the Chassis Assembly and Drain Tray Assembly.
・Use 2 screws (M4) that come with the product and tighten unit to the
bottom bracket.
Screw in two screws onto bottom
of body through the bottom bracket
Bracket (Bottom)
(M4×6) ×2
Chassis Assembly
Water tray
Attach water tray after
installation is complete

Wiring Diagram

Sensor
P6
P2
P7
W
W
Motor
P1-1
P1-2
W
P3
Control
B
Assembly
Power
Connector
B
Motor
W
G
Body Case
G
B=BLACK
W=WHITE
G=GREEN

Publicité

Table des Matières
loading

Table des Matières