Evolur KYOTO Manuel Du Propriétaire page 11

Masquer les pouces Voir aussi pour KYOTO:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CRIB ASSEMBLY - BASE ASSEMBLY
4
4a. Align the Base frame
(2) towards the left end
of the Bottom rails (3).
Similarly, align the
other Base frame (2)
towards the right end
of the Bottom rails (3).
4b. Insert the Bolts (A) at
the lower hole of both
the Left and Right
Base frame as shown
in the diagram.
4c. Tighten the Bolts (A)
using the Allen Key (C)
provided.
A
Bolt 1-3/4" (×4)
(2)
(3)
11
(3)
(2)
www.evolurbaby.com/help

Publicité

Table des Matières
loading

Table des Matières