Bulb Orientation Installation Options; Main Module Installation - Napoleon HomeShield UVLFS036WB Instructions D'installation Et D'opération

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

4.1

BULB ORIENTATION INSTALLATION OPTIONS

We have provided several options of bulb orientation for the installer to choose from. This is to accommodate
any duct system and evaporator coil combination. The following pictures depict the options available for both the
high output and low output primary module. If also using the mobile lance module, take into consideration that
there will only be one bulb in the primary module, although all position options are still available.
4.2

MAIN MODULE INSTALLATION

THESE INSTRUCTIONS ARE INTENDED AS AN AID TO QUALIFIED SERVICE
PERSONNEL FOR PROPER INSTALLATION, ADJUSTMENT AND OPERATION OF THIS
UV APPLIANCE. READ THESE INSTRUCTIONS THOROUGHLY BEFORE ATTEMPTING
INSTALLATION OR OPERATION. FAILURE TO FOLLOW THESE INSTRUCTIONS MAY
RESULT IN IMPROPER INSTALLATION, ADJUSTMENT, SERVICE OR MAINTENANCE,
POSSIBLY RESULTING IN FIRE, ELECTRICAL SHOCK, PROPERTY DAMAGE,
1. Disconnect power to the furnace using the furnace disconnect /
service switch and preferably furnace power circuit from breaker.
2. Locate duct cutout template in desired location for UV Module
keeping in mind location of AC coil, if existing, mark or drill out all
four corners and then cutout 12-1/4" X 6" opening in ductwork.
(Fig.1). Always ensure it is close enough to the HVAC unit to be
able to obtain supply power.
WARNING
!
PERSONAL INJURY OR DEATH.
!
H3.86
FIG. 1
(31.12cm)
12.25"
W415-1309 / B / 11.16.16
7
EN
6.00" (15.24cm)

Publicité

Table des Matières
loading

Table des Matières