RealFlame CT0011LP Manuel D'instructions page 5

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

NATURAL GAS CONVERSION
6.) Locate the new NG orifice spud, verify it is the correct number.
The number
4.05mm
should be on the end of the orifice spud.
4.05mm
7.) Slip sleeve over primary air opening. See fig. 1
Next, screw the new NG orifice spud into the burner base. See fig. 2
1
Primary Air
NG Orifice
Opening
2
Spud
Sleeve
4

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Ct0003lp

Table des Matières