PRE-INSTALLATION CHECKLIST
When preparing cooktop opening,
A
make sure the inside of the cabinet and
the cooktop do not interfere with each
other. (See section on preparing the
opening.)
Remove packaging materials and
B
literature package from the cooktop
before beginning installation.
Styrofoam
Packaging
Cooktop
Installation Instructions
Literature Package
3
Remove Installation Instructions from
C
literature pack and read them carefully
before you begin.
Be sure to place all literature, Use and
Care, Installations, etc. in a safe place
for future reference.
Make sure you have all the tools and
D
materials you need before starting the
installation of the cooktop.
Your home must provide the adequate
E
electrical service needed to safely and
properly use your cooktop. (Refer to
section on electrical requirements.)
When installing your cooktop in your
F
home, make sure all local codes and
ordinances are followed exactly as
stated.
G
Make sure the wall coverings,
countertop and cabinets around the
cooktop can withstand heat (up to
200°F) generated by the cooktop.