AirKing AX Serie Manuel D'utilisation page 3

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Damper
Figure 5
4.
Install an approved wire connector to the electrical knockout of the hood and guide the
electrical cable through the hood, allowing at least 6" of wire for connections and tighten.
NOTE: If installing into existing construction and you will not have access to the ductwork
once the hood is in place, make ducting connections at this point. Refer to the Ducting Section
for instructions.
5.
Install the 4 mounting screw at the previously marked locations. Leave approximately 1/8"
clearance. Slide the hood in place through the keyhole slots and align the front of the hood
so that it is flush with the front of the cabinets. Tighten all screws securely (Figure 6).
1/8"
Figure 6
CAUTION:
DO NOT INSTALL CLOSER THAN 22 INCHES ABOVE COOKING SURFACE.
SECTION 5
Wiring
CAUTION:
ALL ELECTRICAL CONNECTIONS MUST BE MADE IN ACCORDANCE
WITH LOCAL CODES, ORDINANCES, OR NATIONAL ELECTRICAL CODE. IF YOU ARE
UNFAMILIAR WITH METHODS OF INSTALLING ELECTRICAL WIRING, SECURE THE
SERVICES OF A QUALIFIED ELECTRICIAN.
1.
Connect the 2 loose White wires from the range hood to the White wire from the supply,
and the loose Black wire from the range hood to the Black wire of the supply. Connect
the ground wire (green or bare) from the supply to the green ground screw of the hood.
Use approved methods for all connections (Figure 7).
Neutral
(White)
from Light
Neutral (White)
from Motor
Figure 7
6728008 Rev. B 3-13
Hood
Body
E-22A/RCD7
Tab
Hot (Black)
Ground
(Green or Bare)
NOTE: DO NOT disconnect any wiring that has already been crimped with a wire connector
from the factory.
2.
Install the wire compartment cover and tighten screw. Make sure all wiring is securely
contained within the wire compartment.
SECTION 6
Ducting
CAUTION:
BUILDING CODES.
WARNING:
1.
Connect the ducting to the hood's duct collar and damper. Secure in place using tape to
seal all joints (Figure 8).
Figure 8
Keyhole
CAUTION:
ROOF CAP.
SECTION 7
Finishing the Installation
1.
Install the appropriate filter sliding the back side of the filter into the tab and pressing the
front of the filter into place (Figure 9).
Figure 9
2.
Turn switches to the "OFF" position and restore power. Test that the light and the fan are
operating properly.
3.
If there is any vibration noise, check for the source and try to tighten fasteners.
SECTION 8
Operation
Controls
Your Range Hood is equipped with two rocker style switches with one controlling the lighting
and the other controlling the exhaust fan. The light switch has two positions, ON ( I ) and OFF
( II ). The fan is a three position switch, HIGH ( II ), LOW ( I ), and OFF. OFF is the middle position
of the switch.
www.airkinglimited.com
ALL DUCTING MUST COMPLY WITH LOCAL AND NATIONAL
TO REDUCE THE RISK OF FIRE, USE ONLY METAL DUCTWORK.
ALWAYS DUCT THE FAN TO THE OUTSIDE THROUGH A WALL OR
3 of 12

Publicité

Table des Matières
loading

Table des Matières