bottom, please pay attention to it. Please hold the drainage nozzle (accessory) into the
hole and clip it well, and then connect a pipe to drain the condensation water out.
B.Wiring
1-Connect to appropriate power supply, the voltage should comply with the rated
voltage of the products. Ground the machine well.
2-Wiring must be handled by a professional technician according to the circuit
diagram.
3-Set leakage protector according to the local code for wiring (leakage operating
current ≤ 30mA).
4-The layout of power cable and signal cable should be orderly and not affecting each
other.
C.Switch on after finishing all wiring construction and re-checking.
VI. Operation Instruction
Picture for keys
Water Temp And
Time Setting
Timer Indicator Light
Timer On
Timer Indicator Light
CLOCK
TIME ON
9
Heating
Power On/Off
Clock
Timer Off
TIME OFF
HEAT