INSTALLATION
NOTE!
• Before installing the Saunum
Professional be sure that the
sauna steam room is prepared
in accor dance with construction
standards and has been approved
by the fire inspector as is man
datory.
• The wall and ceiling construction
behind the heater must not con
tain combustible materials, the
heat accumulating back wall sur
face materials must be insulated.
• The sauna room shall be provided
with proper ventilation. Insulat
ing the required air inlet and out
let flues used is forbidden.
• Before installing the Saunum
Professional climate device be
sure that it is positioned in such
a way that the minimum distance
requirements are met as shown in
Table 1.
28
1. Remove side panels.
2. Remove the protective film and affix flue
with bolts.
3. Before adding the side panels back,
remove the protective film from them.
Use protective gloves to
avoid smearing the side
panel surface.
29