Tap Equipment And Assembly; Tools Required For Installation - AGA marvel MO24BN Série Instructions D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

This beer dispensing unit will support one half (
or one quarter (
) barrel. The double draft tower units can
1
4
support two sixth (
) barrels of beer. See chart below for
1
6
quantity of beer in each barrel size.
1/6 barrel
23
"
5
16
Height
(59.2 cm)
9
"
1
4
Diameter
(23.5 cm)
Gallons
5.16
#12 ounce
60
Glasses
Keg Size
5 gallon Corny
1/6 barrel
1/4 Barrel
1/2 Barrel
Table B
CAUTION
!
Information that follows on pages 11 through 18 does not
apply to models MO24BN, as these models do not include
any tap and tower equipment. Refer to your beer equip-
ment manufacturer information regarding to the installation
of this equipment.

Tap Equipment and Assembly

Your dispensing kit includes the following parts:
Polished stainless steel tower with clear beer line (single
or double dispense)
Tower Gasket
Phillips oval head screws
Knob for Tower (Faucet Handle)
Keg coupler(s)
CO
regulator with red gas line(s) attached
2
Empty 5 pound CO
tank
2
Plastic clamp(s) large and small
Faucet wrench
USING YOUR BEER DISPENSER
) barrel
1
2
Barrel Sizes
1/4 Barrel
1/2 Barrel
14
"
23
13
5
16
(37.6 cm)
(59.2 cm)
17"
17" to 17
(43.2 to 43 cm)
(43.2 cm)
7.75
15.5
82
163
Table A
#of kegs per
5 pound CO
Tank
2
15 to 22
14 to 21
10 to 14
5 to 7

Tools required for installation:

Flat bladed screwdriver
Phillips screwdriver
Pliers
Adjustable wrench or a 1
" open end wrench
1
2
"
16
"
1
4
CO
can be dangerous. If it becomes difficult to
2
breathe and/or your head starts to ache, a high
concentration of carbon dioxide may be present.
Leave the area immediately.
The CO
regulator. Never connect the tank to the keg.
The CO
upright position. Secure it with the chain pro-
vided.
Never drop or throw the CO
Keep the CO
Ventilate the area after a CO
1. Remove shelving and packaged components from the
interior of the refrigerator before beginning the assem-
bly process.
2. Take your empty 5 pound CO
supply dealer to be filled. You can usually find them in
your "yellow pages" under "Welding Supply" or "Fire
Protection". One 5 pound tank can process many kegs
(see Table B).
3. Tower mounting (if you are installing the unit under a
counter skip to step 4). If you are mounting the tower
directly to the top of the refrigerator, first remove the
four screws from the top of the refrigerator. Remove the
foam plug from the large hole in the top of the refrigera-
tor. Feed the clear beer line through the tower gasket
and the large hole in the refrigerator top. Align the 4
holes in the tower with the 4 holes in the refrigerator
top and secure the tower with the 4 screws removed
previously. Skip to step 5.
11
" open end wrench
1
8
WARNING
!
tank must always be connected to the
2
tank must be securely mounted in the
2
tank.
2
tank away from heat.
2
leak.
2
tank to your local gas
2

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Mo24bs sérieMo24bt série

Table des Matières