Installation Instructions – Utility LED Acorn (ULA)
INSTALLATION
This lighting fixture has been shipped complete for post
mount (3" Tenon). Please follow the installation instructions
specific to the catalog part that you ordered.
N
ote:
Care must be taken not to touch the light engine.
Tools required
Torque wrench, 1/8" Allen key, 12 points 3/8" socket and
wrench, breakable thread locker.
Post Mount Single Luminaire Installation
1.
Remove access door by turning the captive quarter turn
screw counter clockwise to disengage lock. (Figure 1.)
(2) Mounting Bolts
Photocell Receptacle
and Bracket
Access Door
Figure 1.
2.
Pull service leads through luminaire base and out
through access door opening.
3.
Place luminaire on pole and rotate until "STREET
SIDE" is oriented toward the street or desired position.
Tighten three square head bolts to 140-160 in-lbs.
(Figure 2.)
2
COOPER LIGHTING SOLUTIONS
Square Head
Bolt (3X)
Quarter Turn Captive Screw
IB516006EN
Installation instructions
Figure 2.
4.
Connect service leads to terminal block. For easy
access to terminal block temporary remove photo
control bracket. Bracket may be removed by loosening
two #8 hex head screws and lifting bracket away from
power tray (Figure 3). After connecting service leads,
insert and twist to lock photocell (if used) to photo
control receptacle. Reinsert photo control bracket to
electrical bracket and tighten screws.
Figure 3.
LED Engine
(Do Not Touch)
Housing
Tenon Screws (3X)
Torque: 140-160 in-lbs.
#8 Hex Head
Screw (2X)